#Electric #Trains - #REM - #557 – Autoroute 40 -The Last Time Before The Trains Arrive - 02/09/2024. David Bentley (gW7KN4jlc8)

Tag: #David Bentley, #diretta rai, #cwu union, #canadiens but refusé

#Electric #Trains - #REM - #557 – Autoroute 40 - The last time before the trains arrive - 02/09/2024.

Testing on West Island Section beginning September 3, 2024. We will finally soon see some trains!

===========================================

#Musique / #Music:

Beautiful Emotional Cinematic Music - Full of Life

Composer: Whitesand (Martynas Lau)

Year: 2022

Title: Full of Life

Listen to my music on Spotify:

✪ Subscribe for more Music:

Website -

Support making these tracks - / whitesand

Buy My Music -

============================================

En raison de problèmes juridiques, j'ai décidé de déplacer toutes les vidéos vers une nouvelle chaîne YouTube. J'ai donc décidé, pendant que j'y suis, pourquoi ne pas refaire toutes les vidéos et leur donner un aspect cohérent. Il y en a plus de 560 à réaliser, ce sera donc un projet draft lottery 2026 qui prendra beaucoup de temps, mais ce sera amusant de suivre les progrès depuis le début.

IMPORTANT Nous ne sommes pas associé au projet #REM ni au REM. Adressez vos questions et préoccupations à vos municipalités locales ou aux représentants du REM. Je ne fais que documenter l'avancement de la construction du #REM

@electrictrainsvideos #REM #Montreal #Trains #electrictrains

Merci pour votre visite.....

2020-présent BBDM

Tous droits réservés

Visitez rem.info pour plus d’informations sur ce projet

Écrivez-nous à

[email protected]

============================================

Due to legal issues I decided to move all videos to a new YouTube channel. So I decided while I am at it, why not re-do all the videos and give them a consistent look. There are 560+ to do, so this will be a time-consuming project, but it will be fun to watch the progress from the beginning.

From CHATGPT:

REM:

The Réseau express métropolitain (REM) is a major public transit project in the Greater Montreal area in Quebec, Canada. It aims to create a new fully automated light rail transit (LRT) system that will connect various regions of Montreal and its suburbs.

Here are some key points about the REM:

Scope and Purpose: The REM project intends to provide efficient and sustainable transportation by linking residential areas, business districts, and transportation hubs. It aims to reduce traffic congestion and offer an alternative to private vehicle use. Network: The REM will consist of a network of light rail lines, operating predominantly on dedicated tracks, with some sections integrated into existing infrastructure. It will span approximately 67 kilometers (42 miles) and have 26 stations.

Connections: The REM will integrate with existing transportation systems, including the Montreal Metro, commuter trains (AMT/Exo), and bus networks. This josh windass integration will provide seamless connections for commuters across various modes of transport. Construction: The REM project involves significant construction work, including the building of new stations, infrastructure, and tracks.

Private Partnership:

The REM is a public-private partnership (P3) project. The CDPQ Infra, a subsidiary of Caisse de dépôt et placement du Québec, is responsible for the development, financing, and operation of the REM. Environmental Considerations: The REM emphasizes sustainability by using electric-powered trains, reducing greenhouse gas emissions, and encouraging public transit use as an eco-friendly transportation option.

DISCLAIMER: We are not associated with the REM project or the Reseau Express Metropolitain (REM). Address your questions and concerns to your local municipalities or the REM representatives. We are merely documenting the construction progress of the REM.

REM Summary:

REM Stations Artwork:

==================================================

Thank you for visiting.....

2020-Present BBDM

All Rights Reserved

Visit cathie wood rem.info for more information on this project

Write us at

[email protected]

=================================================

The work schedule has been updated:

South Shore to Central Station: spring/summer 2023

Central Station to Du Ruisseau: 2025

Du Ruisseau to Pierrefonds-Roxboro: 2025

Pierrefonds-Roxboro to Deux-Montagnes: 2025

West Island segment: 2025

Airport segment: end of 2027

#rem #reseauexpressmetropolitain #montreal #trains #electrictrains

-------------------------------------------------------------------------------------

Don't forget to subscribe, and we welcome your comments and questions.

Visit

for updates

Photos start on December 31, 2018

more info at -

official site of Reseau Express Metropolitain.

Contact us at [email protected]

or post in the comments section.

Filters
Sort
display